Index index by Group index by Distribution index by Vendor index by creation date index by Name Mirrors Help

The search service can find package by either name (apache), provides(webserver), absolute file names (/usr/bin/apache), binaries (gprof) or shared libraries (libXm.so.2) in standard path. It does not support multiple arguments yet...

The System and Arch are optional added filters, for example System could be "redhat", "redhat-7.2", "mandrake" or "gnome", Arch could be "i386" or "src", etc. depending on your system.

System Arch

RPM resource bundled(rust-crate:codex-utils-critical-path)

Found 4 RPM for bundled(rust-crate:codex-utils-critical-path)

PackageSummaryDistributionDownload
openai-codex-0.166.0-3.1.x86_64.htmlOpenAI Codex coding agent for the terminalOpenSuSE Tumbleweed for x86_64openai-codex-0.166.0-3.1.x86_64.rpm
openai-codex-0.166.0-2.1.x86_64.htmlOpenAI Codex coding agent for the terminalOpenSuSE Tumbleweed for x86_64openai-codex-0.166.0-2.1.x86_64.rpm
openai-codex-0.166.0-1.1.aarch64.htmlOpenAI Codex coding agent for the terminalOpenSuSE Ports Tumbleweed for aarch64openai-codex-0.166.0-1.1.aarch64.rpm
openai-codex-0.166.0-1.1.riscv64.htmlOpenAI Codex coding agent for the terminalOpenSuSE Ports Tumbleweed for riscv64openai-codex-0.166.0-1.1.riscv64.rpm

Generated by rpm2html 1.6

Fabrice Bellet